Hluhluwe CWS Phase 1A: KwaZulu-Natal Extensions of distribution pipelines and WTW at the Hluhluwe Phase 1 CWS. Mhlatuze Water 10/00 07/01 5.40
"Flood damage repairs: Rural villages throughout Northern Province" "Repairs of water services infrastructure that resulted from February 2000 deluge comprising short term (emergency) and long term measures re borehole installations, pump and gravity mains, reservoirs, pump stations, reticulation, river crossings and access roads

4 Sites or villages

12 Sites or villages

12 Sites or villages"

Eastern District Municipality
Mopani District Municipality
Vhembe District Municipality
11/00

03/00

03/00

09/01

03/02

06/02

3.00

9.00

24.00

Hluhluwe CWS Phase 2: KwaZulu-Natal Design, specification, Construction supervision of Hluhluwe Phase 2. Community Water Supply Scheme comprising the raw-water abstraction from the Hluhluwe river. Modular Water Treatment works 80m³/h, 1,4Ml command reservoir. 400km bulk and reticulation pipelines Mhlatuze Water 05/00 08/03 36.00
Blouberg Water supply systems including boreholes to Ga Mankgodi, Vergelegen, Grootdraai and Papegaai villages Blouberg Municipality 04/01 08/01 1.20
Tugela Estates - Phase 2 - KwaZulu-Natal Design and specification for the extension of the Tugela Estates Scheme to include the high command zone. Included is a clear water pump station, 200kl, Reservoir, Rising main and Distribution pipelines. DWAF 10/00 09/01 5.00
Mount Fletcher Water Supply - Xaxazana and Sidaka- Eastern Cape Design, contract documentation, supervision and management of water supply to the villages of Xaxazana and Sidaka in Mount Fletcher. The contract comprise the drilling and equipping of boreholes at these two villages and the construction of bulk and reticulation distribution pipelines as well as the construction of storage reservoirs. Alfred Nzo District Municipality 02/01 07/01 1.20
Umzimkulu Water Supply - Clydesdale and Machunwini- Eastern Cape Design, contract documentation, supervision and management of water supply to the villages of Clydesdale and Machunwini in Umzimkulu. The contract comprise the drilling and equipping of boreholes at these two villages, the construction of bulk and reticulation distribution pipelines and the construction of precast storage reservoirs. Alfred Nzo District Municipality 03/01 09/01 2.20
Aganang Water supply systems including boreholes to Ga Rawesi, Lekiting and Nonono villages Aganang Municipality 04/01 08/01 1.20
Table Mountain Water Scheme - KwaZulu-Natal Water supply to 8000 people. A total of 24km of reticulation pipelines constructed using labour intensive construction methods. Umgeni Water
Marite / Mhala Reticulation The design, documentation and contract supervision of 8km reticulation pipeline Bushbuckridge Municipality 04/03 03/04 1.80
Dwarsloop / Maviljan Reticulation The design, documentation and construction of 3kms 500 dia welded steel pipeline Bushbuckridge Municipality 03/04 11/04 8.00
Schools to be used as IEC voting stations water supply a) Project engineer for the installation of water supply systems to 64 schools in Limpopo
b) Provincial coordination for installation of water services to 530 schools
Depart of Education Limpopo 11/03 07/04 9.6

0.8
Tshakhuma South : Extension Rural water supply scheme comprising borehole equipping, bulk supply pipelines, 600kl reservoir and reticulation network. Six rural villages with a population of 6600 to benefit. DWAF 2.90
GaNkwana Housing : Reticulation and Storage Rural village water services to 2000 stands including assistance to HD consultant Sekhukhune DM 06/02 04/04 4.00
Blyde Wildlife Estate Design, supervision and contract management of the development of 157 stands. Services include bulk water supply, water reticulation, streets. Contract management includes coordination of civil and electrical engineers and Telkom. Marineco 06 (Pty) Ltd 11/03 12/04 6.30
Hluhluwe CWSS Phase 3: Kwazulu Natal Design, specification and construction supervision of scheme comprising 288km bulk and reticulation lines to supply 30 000 people. DWAF 04/04 10/07 79.00
Lourdes CWSS - Umzimkulu District Design, specification and construction supervision of scheme supplying water to 15 villages. Alfred Nzo District Municipality 03/04 10/05 12.00
Umzimkulu Water Supply - Eastlands Engineering services and construction management for water supply to village. Alfred Nzo District Municipality 05/02 07/02 0.80
Sekiti Water Supply Design of bulk water infrastructure and borehole pump equipment Dynacon 3.00
Molemole West & East Village Schemes Upgrading of bulk water supply infrastructure and reticulation network Capricorn District Municipality 9.00
Casteel Reticulation Reticulation in Casteel village, 19 km uPVC pipes plus 41 domestic draw-offs. Emergency water supply projects in 6 villages. Bushbuckridge Local Municipality 01/06 2.00
Water Supply Emergency Projects Design of Emergency water supply projects Bushbuckridge Local Municipality 4.50
Kumana Water Supply Reticulation in Kumana village, 8.9 km uPVC pipes plus 22 domestic draw-offs. Bushbuckridge Local Municipality 11/06 04/07 1.42
Kaditshwene Water Supply Design, specification and construction monitoring of 5 832 m, 24 standpipes, elevated 600 kl steel tank and development of borehole with rising main. Mogalakwena Local Municipality 09/06 11/07 2.30

Top Previous PageAssignments Index Next Page

Copyright © 2008 EVN AFRICA Consulting Services (PTY) LTD Reg. No 2002/029286/07
P.O. Box 236 · 30 Schoeman Street · Polokwane 0700 · South Africa
Tel: +27 15 291 2020 · Fax: +27 15 295 8599 · eMail Address: pbg@evn.co.za

Website Designed & Maintained by See-iT Technologies · Go HERE to email our Webmaster

Click HERE!
Consulting Services